108月
针对现阶段的装配式建筑的推行,为积极响应装配式建筑的应用,现阶段成都地区项目的装配式建筑相关应用集中在预制构件、轻质隔墙装配式建筑体系上,本文通过对预制构件、轻质隔墙装配式建筑体系从工期、质量、安全以及投资等多个维度的对比分析,
运用DMAIC方法降低变更率及拆改费用,找出变更及拆改的关键因子,分析关键因子与BIM的关联性,利用BIM技术优化商业项目管理模式,最后通过BIM的碰撞报告进行变更拆改的费用测算来评估效果。
![/attached/image/20210810/ /attached/image/20210810/](/attached/image/20210810/202108101452059_939.png)
![/attached/image/20210810/ /attached/image/20210810/](/attached/image/20210810/202108101454016_687.png)
![/attached/image/20210810/ /attached/image/20210810/](/attached/image/20210810/202108101455013_252.png)
![/attached/image/20210810/ /attached/image/20210810/](/attached/image/20210810/202108101456044_456.png)
![/attached/image/20210810/ /attached/image/20210810/](/attached/image/20210810/202108101457052_146.png)
![/attached/image/20210810/ /attached/image/20210810/](/attached/image/20210810/202108101458057_819.png)
![/attached/image/20210810/ /attached/image/20210810/](/attached/image/20210810/202108101505003_536.png)
287月
建设工程造价纠纷时常发生,严重影响建设工程施工合同当事人的正常经营活动。在工程造价纠纷的众多争议问题中,工程欠付款及利息计算问题较为突出,给承包人合法利益造成重大损失,该问题长期困扰施工承包人。
2019年年末,我国突发由新型冠状病毒感染肺炎疫情。在党中央的坚强领导和全国人民的团结奋战下,成功地阻止了疫情的爆发,控制了疫情的蔓延。
197月
综合管廊也被称为综合管沟、共同沟或地下共同沟,是指城市地下将采用传统直埋敷设或架空敷设的市政公用事业管线(电力、通信、广电、给水、排水、热力、燃气等市政管线)进入集中敷设的公共隧道—综合管廊。
![/attached/image/20210719/ /attached/image/20210719/](/attached/image/20210719/202107191540028_117.png)
197月
新冠肺炎疫情下建筑工程造价的索赔与一般不可抗力的索赔有相同点也有不同点,疫情带给造价控制的影响是控制造价的难点也是重点,依据政策可合理索赔工期和费用,提高工程质量。
目前,因为越来越多的公共性配套设施出现了装修老旧化、设施破损以及各种结构功能失效的现象,所以建筑市场上出现了大量的公区装饰装修改造工程,其中不乏工程总承包(EPC)模式下的装饰装修改造工程。